From a Messy Brief to a First Plan

Turning a vague request into scope, milestones and open questions.

The brief you actually get

Textbook projects start with a clear charter. Real ones start with an email that says something like: "We need to get the new supplier portal live before the end of the year. Can you pull a plan together? Marketing want to be involved. Talk to Sam." Attached is a slide deck from a meeting you were not in, and a spreadsheet with four tabs, one of which is labelled "old DO NOT USE".

Your job in the first week is to turn that into something people can argue with. Not a finished plan. A first plan: what we think the scope is, the rough shape of the milestones, the assumptions we are making, and the questions nobody has answered yet.

This is one of the best uses of AI in the whole job. Structuring a mess is exactly what it is good at, and a first plan is supposed to be wrong in places, because its purpose is to surface the places where it is wrong.

Four sections, always

Whatever the brief, the first plan has the same four parts.

Scope. What is in, and what is out. The out list matters more, because that is where the arguments are hiding. If the brief says "supplier portal", is supplier onboarding in? Training? Migrating the old records?

Milestones. A handful of checkpoints, each with a test for whether you have reached it. Not dates yet, or at least not dates you believe. The shape comes first.

Assumptions. Everything the plan quietly relies on. Budget exists. Sam is available. The old system can be switched off. Writing these down turns hidden risks into visible ones.

Open questions. What you need someone to answer before the plan can firm up, and who that someone is.

Assumptions and open questions are the most valuable part of a first plan, and the part people most often skip. A plan with no assumptions listed has plenty of them. They are just invisible.

The lazy prompt and the useful one

โŒ Weak prompt

Prompt

Create a project plan for launching a supplier portal by the end of the year.

Output

Phase 1: Discovery (Weeks 1-3). Phase 2: Design (Weeks 4-8). Phase 3: Development (Weeks 9-16). Phase 4: Testing (Weeks 17-20). Phase 5: Launch (Week 21). Key stakeholders: IT, Procurement, Marketing, Legal.

Tidy, generic and dangerous. Every duration is invented, the phases would fit any project on earth, and nothing it says came from your brief. Worse, it looks finished, so someone will paste it into a slide.

โœ… Good prompt

Prompt

Below is the brief I was given, plus my notes. Do not produce a timeline or any durations. Give me four sections: SCOPE (split into IN, OUT, and UNCLEAR), MILESTONES (as outcomes with a test for each, no dates), ASSUMPTIONS the brief is quietly making, and OPEN QUESTIONS with who is likely to know the answer. Only use what is in the brief. Where the brief is silent, put it under UNCLEAR or OPEN QUESTIONS rather than filling the gap.

Output

SCOPE IN: supplier-facing portal for invoice submission. OUT: nothing stated. UNCLEAR: migrating existing supplier records; supplier training. MILESTONES 1. Requirements agreed. Test: signed off by Procurement. ASSUMPTIONS 1. The current system can run in parallel until launch. OPEN QUESTIONS 1. What does Marketing's involvement mean in practice? Ask Sam.

Everything is traceable to the brief, the gaps are labelled as gaps, and there is nothing pretending to be a date. This is something you can take into a room and use to start the right arguments.

The most important line in the good prompt is the ban on durations. Left alone, a model will cheerfully fill a timeline with plausible numbers, and plausible numbers are the hardest kind to remove once people have seen them. Estimates come later, from the people doing the work. Lesson five has more on why.

Checkpoint

A first plan has four parts, scope, milestones, assumptions and open questions, and you should forbid the AI from inventing durations while it drafts them.

The reusable prompt

Keep this somewhere you can find it. It works on a one-line email and on a forty-page document.

Prompt you can copy: brief into a first plan

I am a project manager. Below is a brief for a new project, plus any notes I have. Turn it into a first plan with exactly these sections:

SCOPE Three lists: IN, OUT, UNCLEAR. If the brief does not mention something a project like this would usually involve, put it under UNCLEAR.

MILESTONES Five to eight outcomes, in a sensible order. For each, one sentence describing how we will know it is reached. No dates, no durations.

ASSUMPTIONS Everything the brief takes for granted about budget, people, systems, suppliers, approvals and timing. One line each.

OPEN QUESTIONS What must be answered before this plan can firm up. For each, suggest the role most likely to know, but do not invent names.

Rules:

  • Only use information in the brief and my notes.
  • Do not estimate effort, cost or time.
  • Where the brief is vague, say so rather than filling the gap.
  • Keep it to one page.

BRIEF AND NOTES: [paste here]

When the brief is a conversation

Sometimes there is no email at all. The brief arrives as a ten-minute chat in a corridor, or a sponsor thinking out loud on a call. In that case, write down what you heard as soon as you can, in your own words, including the bits you are not sure about. Mark anything you are guessing with a question mark. Then feed those notes into the same prompt.

Do not be tempted to tidy your notes first. The hesitations are useful. "Sam said end of year, I think, but may have meant financial year" is exactly the kind of line that should end up under OPEN QUESTIONS, and a polished version would have quietly settled it for you.

Then argue with it

The output is a draft for you to attack, not a plan to send. Read it with the brief open. Anything in SCOPE that you cannot trace back to the brief or your notes, delete. Anything missing from ASSUMPTIONS that you know from experience, add. The model does not know that the last three portal projects stalled at security review. You do.

Once you have edited it, one more prompt is worth running, because it catches the gaps you have become blind to.

Prompt you can copy: find what the plan forgot

Here is my first plan. Read it as a sceptical sponsor would. List the five questions you would ask in the first meeting that this plan cannot yet answer. Do not rewrite the plan. Just the questions.

Then take the open questions to the people who can answer them. That conversation is the actual planning. Everything before it was preparation.

Check your organisation's rules before pasting a brief into an AI tool. Supplier names, budgets and unannounced projects are often confidential, and a first plan is precisely the kind of document that contains all three.

Checkpoint

Treat the generated plan as something to attack: trace every line to the brief, add what you know from experience, then take the open questions to people.

๐Ÿ“ Quiz

Question 1 of 4

What is the purpose of a first plan?